Cleanroom Contractor in Batam, Indonesia

Cleanroom Contractor · Batam

Cleanroom Contractor. Built for Batam's Industry.

ISO Class 5–8 cleanroom design and construction for semiconductor, pharmaceutical, and medical device facilities across Batam — engineered for contamination control, airflow precision, and GMP compliance.

Cleanroom Services

World-Class Cleanroom Services

Turnkey ISO Class 5–8 cleanroom construction for semiconductor, pharmaceutical, and precision manufacturing facilities in Batam, Indonesia. From design and MEP integration through validation and handover — one team, one point of accountability, audit-ready from day one.

ISO-class Cleanroom SystemsHVAC & Airflow SystemsConstruction & Design
01

ISO-class Cleanroom Systems

ISO Class 5 through Class 8 cleanrooms for semiconductor, pharmaceutical, medical device, and precision manufacturing facilities. Built with modular wall panels, walkable ceiling grids, sealed doors with interlock options, anti-static raised flooring, and engineered pressure cascades that hold classification differentials between adjacent zones — ±5 Pa typical, ±15 Pa for biocontainment.

Commissioning includes ISO 14644 particle count testing at-rest and in-operation, recovery testing, airflow visualisation, and HEPA/ULPA leak testing. For GMP and 21 CFR Part 11 facilities we support IQ/OQ/PQ validation, deliver protocols and executed records, and provide the documentation package needed for regulatory submission and routine audits.

02

HVAC & Airflow Systems

Dedicated air handling units with H13/H14 HEPA and U15 ULPA filtration, ceiling plenum or terminal HEPA distribution, and air change rates from 20 ACH for ISO 8 up to 240 ACH for ISO 5. Sizing accounts for occupancy, internal heat loads, process exhaust, and required recovery times.

BMS integration monitors temperature, humidity, differential pressure, and real-time particle counts across every zone — with automated alerts to operators and maintenance before deviations impact yield. Trend logs are retained per GMP requirements for batch traceability and post-incident root-cause analysis.

03

Construction & Design

Modular wall and ceiling panels (50 mm or 75 mm cores), anti-static raised access flooring, seamless self-levelling epoxy with integral coving, cleanroom-grade electrical and lighting with sealed penetrations, flush-mount stainless fittings, gowning rooms with automated interlocks, and pass-through chambers. All materials and sealants are selected for low outgassing and chemical compatibility with your process.

For upgrades inside operational facilities we plan phased construction so adjacent production lines keep running. New zones are isolated with temporary partitions, negative-pressure containment, and dedicated entry — built, qualified, and handed over independently under full contamination controls. Detailed schedules are issued before mobilisation and tracked weekly through to validation.

ISO-class Cleanroom Systems

ISO Class 5 through Class 8 cleanrooms for semiconductor, pharmaceutical, medical device, and precision manufacturing facilities. Built with modular wall panels, walkable ceiling grids, sealed doors with interlock options, anti-static raised flooring, and engineered pressure cascades that hold classification differentials between adjacent zones — ±5 Pa typical, ±15 Pa for biocontainment.

Commissioning includes ISO 14644 particle count testing at-rest and in-operation, recovery testing, airflow visualisation, and HEPA/ULPA leak testing. For GMP and 21 CFR Part 11 facilities we support IQ/OQ/PQ validation, deliver protocols and executed records, and provide the documentation package needed for regulatory submission and routine audits.

HVAC & Airflow Systems

Dedicated air handling units with H13/H14 HEPA and U15 ULPA filtration, ceiling plenum or terminal HEPA distribution, and air change rates from 20 ACH for ISO 8 up to 240 ACH for ISO 5. Sizing accounts for occupancy, internal heat loads, process exhaust, and required recovery times.

BMS integration monitors temperature, humidity, differential pressure, and real-time particle counts across every zone — with automated alerts to operators and maintenance before deviations impact yield. Trend logs are retained per GMP requirements for batch traceability and post-incident root-cause analysis.

Construction & Design

Modular wall and ceiling panels (50 mm or 75 mm cores), anti-static raised access flooring, seamless self-levelling epoxy with integral coving, cleanroom-grade electrical and lighting with sealed penetrations, flush-mount stainless fittings, gowning rooms with automated interlocks, and pass-through chambers. All materials and sealants are selected for low outgassing and chemical compatibility with your process.

For upgrades inside operational facilities we plan phased construction so adjacent production lines keep running. New zones are isolated with temporary partitions, negative-pressure containment, and dedicated entry — built, qualified, and handed over independently under full contamination controls. Detailed schedules are issued before mobilisation and tracked weekly through to validation.

Proven for International Manufacturing Standards

Delivering cleanroom projects in Batam, Indonesia for international manufacturers operating under strict performance and compliance requirements. Our completed facilities serve active production lines in semiconductor fabrication, medical device assembly, and pharmaceutical manufacturing.

Precision-driven, repeatable environments
Stable conditions for sensitive equipment
Validation-led and audit-ready execution
Minimal to zero production downtime

Clients rely on our disciplined methodology, structured documentation control, and schedule-driven project delivery.

Alcon
Batamindo
Blackmagic Design
CEME Group
Excelitas
HJS

From Shell to Validation.

From production expansions to new ISO Class 5–8 facilities, our team scopes the build from architectural shell through validation and operational handover. Share your URS, layout sketches, or operating constraints — we'll come back with a phased construction plan, validation strategy, and milestone-based timeline.

Send Your Brief
Epoxy floored cleanroom facilityAnti-static raised floor cleanroomWorld-Class HVAC Plenum SystemAir Handling Unit InstallationAir Handling Unit RoomCold Storage RoomCleanroom Compressed Air System

Epoxy-Floored Cleanroom Facility

Seamless, anti-static epoxy flooring integrated within a controlled cleanroom environment — designed for durability, easy maintenance, and strict contamination control.

Tap for details

Epoxy-Floored Cleanroom Facility

Seamless, anti-static epoxy flooring integrated within a controlled cleanroom environment — designed for durability, easy maintenance, and strict contamination control.

Engineered for Electrostatic Control

Anti-static raised floor cleanroom built to minimise electrostatic discharge and maintain strict contamination control for high-precision manufacturing environments.

World-Class HVAC Plenum System

Engineered plenum and air distribution system designed for uniform airflow, pressure stability, and precise environmental control in cleanroom environments.

Air Handling Unit Installation

Engineered AHU installation delivering controlled airflow, temperature regulation, and stable environmental performance for cleanroom and industrial applications.

Air Handling Unit Room

Dedicated AHU room designed for controlled air distribution, system accessibility, and stable environmental performance within cleanroom and industrial facilities.

Cold Storage Room

Temperature-controlled cold storage facility engineered for consistent cooling performance, insulation efficiency, and reliable environmental stability in regulated industrial environments.

Cleanroom Compressed Air System

Oil-free, contaminant-controlled compressed air system engineered for cleanroom environments — ensuring stable pressure, air purity, and compliance with critical manufacturing standards.